I have done the ground work on one of these about 8 years ago on a new build it cost him about 10k, the hole + concrete was done before the footings were done
I have done the ground work on one of these about 8 years ago on a new build it cost him about 10k, the hole + concrete was done before the footings were done
I have done the ground work on one of these about 8 years ago on a new build it cost him about 10k, the hole + concrete was done before the footings were done
Up-ended sewer pipes might have been cheaper? :whistle: