Hey guys,
The year's edition of Winter Group Buy for YFCM Carbon Driveshafts is up and running.
I've made the process leaner with a lower 20x thresholds instead of 50x, to accelerate lead time from 12-16 weeks to 4-8 weeks.
To sign up: log in, and lock your spot in the group buy here. The discount applies at checkout.
I've also edited a reel here explaining the patented self-locking flange design. The pictures below show the SMG2 variant with the flange designed to clear actuators. The 420G 6spd has a shorter, lighter flange.
If you have any questions, let me know!
Enjoy,
Matt
euroconnex.co
@m3_epoustouflant






The year's edition of Winter Group Buy for YFCM Carbon Driveshafts is up and running.
I've made the process leaner with a lower 20x thresholds instead of 50x, to accelerate lead time from 12-16 weeks to 4-8 weeks.
To sign up: log in, and lock your spot in the group buy here. The discount applies at checkout.
- Save 20% off MSRP
- Threshold: 20 units
- We are currently 10x.
- I've made the process leaner with a lower 20x thresholds instead of 50x to accelerate deliveries,
- Lead time: 4-8 weeks
- E46 M3 applications:
- SMG2
- 420G MT
- ZF 5spd
- All BMW M applications are included
- E9x M3
- E6x M5/6
- E36 M3
- E85 Z4M
- E39 M5
- Ships via UPS / SF Express Expedited Air (3-5 days delivery)
I've also edited a reel here explaining the patented self-locking flange design. The pictures below show the SMG2 variant with the flange designed to clear actuators. The 420G 6spd has a shorter, lighter flange.
If you have any questions, let me know!
Enjoy,
Matt
euroconnex.co
@m3_epoustouflant