Today I’m happy to announce two pieces of exciting information 😊
Firstly I’ve just completed an installation video of a simplified design epoxy/rivet-in VinceBar kit in a Touring. There’s more on the video further down in phis post, but here are two screenshots
Secondly the Practical Performance Facebook page www.Facebook.com/pprndnews just hit 1000 followers! This means that the 10% offer (as described in this post https://www.facebook.com/72205743465...597522472/?d=n) is now live.
Please note that this discount offer is valid during the month of October and limited to just 10 simplified design VinceBar kits. Your choice of the weld-in or epoxy/rivet-in version.
EDIT: I’ve also decided to apply the discount to the tooling kit (when ordered with a simplified VinceBar kit) and shipping.
This makes the discounted total for the VinceBar kit, tooling kit and shipping just 780 USD!
Back to the installation video.
For simplicity of viewing I split it into the three following parts:
• Part 1 includes hole cutting and preparation for the front gusset cups.
• Part 2 includes hole cutting and preparation for the rear bar as well as surface preparation and epoxy bonding and riveting of the rear bar.
• Part 3 includes the finishing preparation touches, and the final installation, of the front gusset cups.
This means that if you are installing just the front gusset cups you could watch just parts 1 and 3.
I do however recommend also watching the last 1/3 of part 2 as there is some suface prepping and gluing/riveting information that is helpful for the front gusset cups.
Sent from my iPhone using Tapatalk
Firstly I’ve just completed an installation video of a simplified design epoxy/rivet-in VinceBar kit in a Touring. There’s more on the video further down in phis post, but here are two screenshots
Secondly the Practical Performance Facebook page www.Facebook.com/pprndnews just hit 1000 followers! This means that the 10% offer (as described in this post https://www.facebook.com/72205743465...597522472/?d=n) is now live.
Please note that this discount offer is valid during the month of October and limited to just 10 simplified design VinceBar kits. Your choice of the weld-in or epoxy/rivet-in version.
EDIT: I’ve also decided to apply the discount to the tooling kit (when ordered with a simplified VinceBar kit) and shipping.
This makes the discounted total for the VinceBar kit, tooling kit and shipping just 780 USD!
Back to the installation video.
For simplicity of viewing I split it into the three following parts:
• Part 1 includes hole cutting and preparation for the front gusset cups.
• Part 2 includes hole cutting and preparation for the rear bar as well as surface preparation and epoxy bonding and riveting of the rear bar.
• Part 3 includes the finishing preparation touches, and the final installation, of the front gusset cups.
This means that if you are installing just the front gusset cups you could watch just parts 1 and 3.
I do however recommend also watching the last 1/3 of part 2 as there is some suface prepping and gluing/riveting information that is helpful for the front gusset cups.
Sent from my iPhone using Tapatalk
Comment