Rod bearing job, using new OEM M10 bolts. Got cylinder 1 done and had some trouble with the E12 heads deforming more than expected on the final 105* sweep. On cylinder 6 now, torque sequence #2 and I'm pretty sure sequence #3 is not going to be successful. The heads are too fucked already. I'm using a 1/2" breaker bar with an analog angle gauge. I have two E12 sockets of different brands, both are (or were) new, both look to be in good shape still. Car is on jackstands, doing this on my back. Subframe not removed but dropped and out of the way.
Didn't see much on a quick search so just wondering. Am I doing something wrong? Others had this issue? At this rate I'm considering switching to ARP. At a minimum I'll need to replace the two in cylinder #6.
Didn't see much on a quick search so just wondering. Am I doing something wrong? Others had this issue? At this rate I'm considering switching to ARP. At a minimum I'll need to replace the two in cylinder #6.

Comment